Road maintenance includes filling of pot holes (volunteers), several loads of road gravel per year spread mostly where needed. Primarily the Wallace Lake Acres road is maintained from the red gate back to the first intersection (Woodland Ave). Lakeview Drive now has a full time house at the end and will be maintained as needed.
The road is usually graded every 2 to 4 years as needed. Totally depends on its condition. Brush cutting along the roads is done by lot owner volunteers…usually in September each year.
Snow removal from driveways is the responsibility of the cottage owner.
We currently have 5 full time residents at site and luckily two have snow plow trucks and volunteer their efforts to clear to the red gate at the government road.
The full time residents who don’t have a snow plow usually hire John Fancy (out on the Fitch Lake Rd) to do the snow removal for the driveways.
Road maintenance back to Wallace Lake is handled by the Wallace Lake owners association.
Here are some details:
President, Peter Berrigan, 902-543-5695
Vacant Lot owners are charged about $30 yearly (tent or moveable camper), Dwelling and cottage owners $150 yearly.
Driveways are not constructed to allow owners to design their own driveway access. Cost for a switch-back driveway is about $4,000.00 per lot. Contact us for the names of a contractor who can give you a good price on this at cowansmithteam@supercityrealty.com